Access Risk Knowledge Cube Ontology
language en

Access Risk Knowledge Cube Ontology

Release: 2020-01-01

Modified on: 2025-02-04
This version:
https://openark.adaptcentre.ie/Ontologies/ARKCube/ontology.ttl
Latest version:
https://openark.adaptcentre.ie/Ontologies/ARKControlsOntology#
Revision:
0.84
Authors:
Junli Liang
Lucy McKenna
Rob Brennan
Yalemisew Abgaz
Contributors:
Ademar Crotti Junior
Julio Hernandez
Natalia Duda
Nick McDonald
Publisher:
https://openark.adaptcentre.ie
Download serialization:
JSON-LD RDF/XML N-Triples TTL
License:
https://creativecommons.org/licenses/by/4.0/
Visualization:
Visualize with WebVowl
Cite as:
Junli Liang, Lucy McKenna, Rob Brennan, Yalemisew Abgaz. Access Risk Knowledge Cube Ontology. Revision: 0.84. Retrieved from: https://openark.adaptcentre.ie/Ontologies/ARKCube/ontology.ttl
Vocabulary maintained at:
https://gogs.adaptcentre.ie/ARK/Ontologies/src/master/ARKCube

http://purl.org/ontology/bibo/unstable

Abstract

The ARK Cube ontology represents the concepts and relationships that are represented in organisational change and its risk. To analyse the organisational change and the risks associated with it, the Centre for Innovative Human Systems, Trinity College Dublin (Prof Nick McDonald and his team) developed the cube methodology which uses a series of questions categorised into project phases, dimensions and aspects of reality. The ARKCube ontology models the cube methodology and modelled the process, content and outcome of such processes (ARK Cube ontology).

Introduction back to ToC

The ARK Cube ontology represents the concepts and relationships that are represented in organisational change and its risk. To analyse the organisational change and the risks associated with it, the Centre for Innovative Human Systems, Trinity College Dublin (Prof Nick McDonald and his team) developed the cube methodology which uses a series of questions categorised into project phases, dimensions and aspects of reality. The ARKCube ontology models the cube methodology and modelled the process, content and outcome of such processes (ARK Cube ontology).

Namespace declarations

Table 1: Namespaces used in the document
ARKPlatform<https://openark.adaptcentre.ie/Ontologies/ARKPlatform#>
arkc<https://openark.adaptcentre.ie/Ontologies/ARKCube#>
bibo<http://purl.org/ontology/bibo/>
dc<http://purl.org/dc/elements/1.1/>
dcat<http://www.w3.org/ns/dcat#>
dcterms<http://purl.org/dc/terms/>
owl<http://www.w3.org/2002/07/owl#>
prov<http://www.w3.org/ns/prov#>
rdf<http://www.w3.org/1999/02/22-rdf-syntax-ns#>
rdfs<http://www.w3.org/2000/01/rdf-schema#>
schema1<http://schema.org/>
skos<http://www.w3.org/2004/02/skos/core#>
sw<http://www.w3.org/2003/06/sw-vocab-status/ns#>
vocab<http://purl.org/vocab/vann/>
widoco<https://w3id.org/widoco/vocab#>
xml<http://www.w3.org/XML/1998/namespace>
xsd<http://www.w3.org/2001/XMLSchema#>

Access Risk Knowledge Cube Ontology: Overview back to ToC

This ontology has the following classes and properties.

Classes

Object Properties

Data Properties

Named Individuals

Access Risk Knowledge Cube Ontology: Description back to ToC

The ARK Cube ontology represents the concepts and relationships that are represented in organisational change and its risk. To analyse the organisational change and the risks associated with it, the Centre for Innovative Human Systems, Trinity College Dublin (Prof Nick McDonald and his team) developed the cube methodology which uses a series of questions categorised into project phases, dimensions and aspects of reality. The ARKCube ontology models the cube methodology and modelled the process, content and outcome of such processes (ARK Cube ontology).

Cross-reference for Access Risk Knowledge Cube Ontology classes, object properties and data properties back to ToC

This section provides details for each class and property defined by Access Risk Knowledge Cube Ontology.

Classes

Actionc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Action

In order to mitigate or reduce risks, additional actions (controls) may be required. These should be described in a manner that will result in a tangible deliverable and be capable of being assigned to a specified post holder for implementation.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Control c
is in domain of
assigned person op, due date dp, has deliverable op

Activityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Activity

The condition in which things are happening or being done. Activity refers to the measurable activity within the system.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Aspect of Reality c

Answerc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Answer

A written account in response to a question asked.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Data Entity c
is in domain of
answer text dp, has evidence rule op
is in range of
has answer op

Approval Statusc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ApprovalStatus

The approval status of a risk assessment.
Date:
03/12/2021
Authors:
Lucy McKenna
has super-classes
Data Entity c
is in range of
has approval status op
has members
Awaiting Final Approval ni, Being Reviewed ni, Closed ni, Final Approval ni, In Holding, Awaiting Review ni, Rejected ni

Artefactc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Artefact

Artefacts are associated to an evidence collection. An artefact may be, for example, a dataset containing information relevant to an answer.
Date:
20/05/2020
Authors:
Ademar
has super-classes
Data Entity c
is in domain of
artefact text dp, file dp, has dataset op
is in range of
has artefact op

Aspect of Realityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#AspectOfReality

Aspect of Reality is a dimension which explores the Functional System, Activity, Sensemaking and Culture across four System Dimensions: Goals, Process, Social, and Knowledge and Information.
Date:
13/11/2019
Authors:
Yalemisew
has sub-classes
Activity c, Culture c, Functional System c, Sensemaking c
is in range of
has aspect op

Causec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Cause

The cause of a risk. Something that brings about an effect. Used for a risk description in ICC (impact, cause, context) format.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
is in domain of
textual description dp
is in range of
has cause op

Contextc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Context

To establish the context means to define the external and internal parameters that organizations must consider when they manage risk. An organization’s external context includes its external stakeholders, its local, national, and international environment, as well as any external factors that influence its objectives. An organization’s internal context includes its internal stakeholders, its approach to governance, its contractual relationships, and its capabilities, culture, and standards.
Date:
28/01/2020
Authors:
Yalemisew
has super-classes
Data Entity c
has sub-classes
Risk Context c
is in domain of
textual description dp
is in range of
has context op, related to context op

Controlc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Control

Any measure or action that modifies or regulates risk. Controls include any policy, procedure, practice, process, technology, technique, method, or device that modifies or regulates risk. They can exist or be required as additional in order to further mitigate the risk. Risk treatments become controls, or modify existing controls, once they are implemented. A mechanism, process, procedure or action which can be verified, that seeks to reduce the likelihood and/or consequence of a risk.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Action c
is in domain of
textual description dp
is in range of
has addtional required control op, has existing control op

Culturec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Culture

A set of collective attitudes, values, goals and practices that characterize a community or system
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Aspect of Reality c

Deliverablec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Deliverable

The output of an action.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
is in range of
has deliverable op

Deliveryc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Delivery

The extent to which plans and improvements have been delivered and are performing consistently.
Date:
08/02/2021
Authors:
Rob Brennan
has super-classes
Obligation to Act Rating c
is in range of
has delivery op
has members
High Delivery ni, Low Delivery ni, Medium Delivery ni, Unspecified Delivery ni

Develop Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#DevelopStage

A develop stage question is a Cube question which is asked at the development stage of the Cube questionnaire.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Efficacyc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Efficacy

The extent to which the solution or improvement can overcome the problem and produce the required result.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Obligation to Act Rating c
is in range of
has efficacy op
has members
High Efficacy ni, Low Efficacy ni, Medium Efficacy ni, Unspecified Efficacy ni

Evidencec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Evidence

Evidence is composed of artefacts and are associated with an answer.
Date:
18/11/2019
Authors:
Yalemisew
Contributors:
Ademar
has super-classes
Data Entity c
is in domain of
evidence rule dp, evidence text dp, has artefact op
is in range of
cites as authority op, cites as potential solution op, cites as related op, cites for information op, discusses op, has evidence op, obtains support from op, refutes op, supports op, updates op, uses data from op

Evidence Reportc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#EvidenceReport

A report on the evidence linked to a project.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-classes
Report c

Evidence Report Templatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#EvidenceReportTemplate

A format template for an evidence report.
Date:
15/09/2021
Authors:
Lucy McKenna
has super-classes
Report Template c

Extremec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ExtremeImpactHSE

Uses HSE primary impact table for definition.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Impact (HSE) c
has members
Extreme Impact - Adverse Publicity/Reputation ni, Extreme Impact - Business Continuity ni, Extreme Impact - Compliance ni, Extreme Impact - Environment ni, Extreme Impact - Finance ni, Extreme Impact - Harm to a Person ni, Extreme Impact - Objectives/Projects ni, Extreme Impact - Service User Experience ni

Final Reportc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#FinalReport

A report that summarises a completed project.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-classes
Report c

Final Report Templatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#FinalReportTemplate

A format template for a final report.
Date:
15/09/2021
Authors:
Lucy McKenna
has super-classes
Report Template c

Functional Systemc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#FunctionalSystem

The Functional System refers to the basic causal structure of the system and the relationships that produce outcomes.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Aspect of Reality c

Gain Achievedc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#GainAchieved

Identfied during the CUBE solution stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Loss or Gain c
is in domain of
textual description dp
is in range of
has gain achieved op

Goalc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Goal

An aim or desired outcome.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
System Dimension c

Handover Reportc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#HandoverReport

A report for handing over a project from one stage to another.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-classes
Report c

Handover Report Templatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#HandoverReportTemplate

A format template for a handover report.
Date:
15/09/2021
Authors:
Lucy McKenna
has super-classes
Report Template c

Impactc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Impact

The impact of a Risk. The powerful effect that something has on somebody/something. The outcome or consequence of an event affecting objectives. It can be expressed either qualitatively or quantitatively, being a loss, disadvantage or gain. There may be a range of possible outcomes associated with an event. Used for risk description following the ICC (impact, cause, context) approach.
Date:
22/09/2020
Authors:
Rob Brennan
has super-classes
Impact Severity c
has sub-classes
Impact (HSE) c, Unspecified Impact c
is in domain of
textual description dp
is in range of
has impact op

Impact (HSE)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ImpactHSE

Risk impact scoring based on the HSE Risk Assessment Tool.
Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Impact c
has sub-classes
Extreme c, Major c, Minor c, Moderate c, Negligible c

Impact Severityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ImpactSeverity

Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Data Entity c
has sub-classes
Impact c, Severity c

Implement Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ImplementStage

Implementation is the execution of a plan. To monitor implementation is to supervise and to continually check and critically observe; to determine the current status and to assess whether required or expected performance levels are being achieved; and to adjust the activity as required.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Importancec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Importance

The extent to which the problem is deserving of serious attention because it has great (actual or potential) effects on people or things, or great value is at stake.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Obligation to Act Rating c
is in range of
has importance op
has members
High Importance ni, Low Importance ni, Medium Importance ni, Unspecified Importance ni

Information and Knowledgec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#InformationKnowledge

Knowledge gained through communication, research, instruction. Familiarity gained by personal experience, vicariously or through collective processes
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
System Dimension c

Likelihoodc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Likelihood

The chance of something happening (also described as the probability or frequency of an event occurring).
Date:
22/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Likelihood (Aer Lingus) c, Likelihood (DFB) c, Likelihood (HSE) c, Unspecified Likelihood c
is in domain of
textual description dp

Likelihood (Aer Lingus)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#LikelihoodAerLingus

The probability that an unsafe event or condition might occur. Likelihood scoring based on the Aer Lingus risk matrix.
Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Likelihood c
has members
Extremely Improbable ni, Extremely Remote ni, Probable ni, Remote ni

Likelihood (DFB)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#LikelihoodDFB

Likelihood scoring based on the DFB risk matrix.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Likelihood c
has members
Almost Certain ni, Likely ni, Possible ni, Rare ni, Unlikely ni

Likelihood (HSE)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#LikelihoodHSE

Likelihood scoring based on the HSE Risk Assessment Tool.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Likelihood c
is in range of
has likelihood op
has members
Almost Certain ni, Likely ni, Possible ni, Rare/Remote ni, Unlikely ni

Loss or Gainc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#LossOrGain

CUBE risk analysis factor
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Gain Achieved c, Potential Loss c, Projected Gain c

Majorc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#MajorImpactHSE

Defined by HSE primary impact table.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Impact (HSE) c
has members
Major Impact - Adverse Publicity/Reputation ni, Major Impact - Business Continuity ni, Major Impact - Compliance ni, Major Impact - Environment ni, Major Impact - Finance ni, Major Impact - Harm to a Person ni, Major Impact - Objectives/Projects ni, Major Impact - Service User Experience ni

Mechanismc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Mechanism

The way in which something is transformed, produced, circulated. A mechanism is a device that transforms input forces and movement into a desired set of output forces and movement. Underlying entities, processes, or (social) structures which operate in particular contexts to generate outcomes of interest.
Date:
28/01/2020
Authors:
Yalemisew
has super-classes
Data Entity c
is in domain of
textual description dp
is in range of
has mechanism op, related to mechanism op

Minorc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#MinorImpactHSE

Defined by HSE primary impact table.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Impact (HSE) c
has members
Minor Impact - Adverse Publicity/Reputation ni, Minor Impact - Business Continuity ni, Minor Impact - Compliance ni, Minor Impact - Environment ni, Minor Impact - Finance ni, Minor Impact - Harm to a Person ni, Minor Impact - Objectives/Projects ni, Minor Impact - Service User Experience ni

Moderatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ModerateImpactHSE

Defined by HSE primary impact table.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Impact (HSE) c
has members
Moderate Impact - Adverse Publicity/Reputation ni, Moderate Impact - Business Continuity ni, Moderate Impact - Compliance ni, Moderate Impact - Environment ni, Moderate Impact - Finance ni, Moderate Impact - Harm to a Person ni, Moderate Impact - Objectives/Projects ni, Moderate Impact - Service User Experience ni

Negligiblec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#NegligibleImpactHSE

Uses HSE primary impact table definition.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Impact (HSE) c
has members
Negligible Impact - Adverse Publicity/Reputation ni, Negligible Impact - Business Continuity ni, Negligible Impact - Compliance ni, Negligible Impact - Environment ni, Negligible Impact - Finance ni, Negligible Impact - Harm to a Person ni, Negligible Impact - Objectives/Projects ni, Negligible Impact - Service User Experience ni

Obligation to Act Ratingc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ObligationToActRating

Used in the CUBE project analysis process to assign a weight or priority to the obligation to act generated at a specific project stage.
Date:
08/02/2021
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Delivery c, Efficacy c, Importance c, Sustainability c, Viability c

Organisationc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Organisation

A group of people who work together in an organized way for a shared purpose e.g., a hospital, a clinic or a service. An organization can be part of or contain other organisations.
Date:
10/03/2021
Authors:
Lucy McKenna
has super-classes
Agent c
has sub-classes
Organisational Unit c
is in domain of
has organisational unit op, name dp
is in range of
has hospital site/service op, member of op, post in op

Organisational Unitc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#OrganisationalUnit

A unit that part of an Organisation, e.g., a ward, department, branch or statutory body, and that only has full recognition within the context of that Organisation. In particular the unit would not be regarded as a legal entity in its own right.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Organisation c
is in range of
has organisational unit op, report analysis to op

Outcomec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Outcome

The end product of a purposive activity. Outcomes can be either intended or unintended, can be proximal, intermediate or final, and result from the activation of different mechanisms in different contexts.
Date:
28/01/2020
Authors:
Yalemisew
has super-classes
Data Entity c
is in domain of
textual description dp
is in range of
has outcome op, related to outcome op

Personc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Person

Defines a person, for example in an organisation.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Agent c
has sub-classes
User c
is in domain of
holds post op, member of op, name dp, reports to op, signature dp, works with op
is in range of
assigned person op, designed by op, has risk assessor op, has risk coordinator op, has risk owner op, informant op, report analysis to op, reports to op, works with op

Plan and Prepare Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#PlanPrepareStage

Identifies the diverse activities required to achieve a desired goal and represent these in a plan. Prepares for the implementation of the plan.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Postc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Post

A position held by a Person within an organisation.
Date:
10/03/2021
Authors:
Lucy McKenna
is in domain of
post in op, reports to op
is in range of
holds post op, reports to op

Potential Lossc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#PotentialLoss

CUBE Problem Stage. Loss is the fact of no longer having something or having less of it than before.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Loss or Gain c
is in domain of
textual description dp
is in range of
has potential loss op

Primary Impact Categoryc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ImpactCategory

The primary area impacted by a risk.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
is in range of
has primary impact category op
has members
Adverse Publicity/Reputation ni, Business Continuity ni, Compliance ni, Environment ni, Finance ni, Harm to a Person ni, Objectives/Projects ni, Service User Experience ni, Unspecified Primary Impact Category ni

Priorityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Priority

The significance of an item (compared to all the Cube dimensions) in contributing to defining the context, identifying key mechanisms or describing critical outcomes, in a particular phase of an ARK Project.
Date:
19/11/2019
Authors:
Yalemisew
has super-classes
Data Entity c
is in range of
has priority op
has members
High Priority ni, Low Priority ni, Medium Priority ni, Unspecified Priority ni

Problem Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProblemStage

Describes the ‘as-is’ situation and identifies aspects which may not be working as well as they could be, leading to potential damage, harm or other unwanted outcomes. Describes the relevant dimensions of the problem space.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Process/Sequencec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProcessSequence

The key activity of the operation; a sequence of activities and stages through which an initial state is transformed into the final state
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
System Dimension c

Project Analysisc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProjectAnalysis

In the CUBE methodology this is an assessment of: Risk (or Operational risk) in the problem stage. (Potential) mitigation of risk in the solution stage. (Potential) Risk in Change in the planning stage. Risk in Implementation (actual risk in change) / Implementation risk in the implementation stage. Residual risk (verified following implementation) in the verify stage.
Date:
12/01/2021
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Risk Assessment c, Risk Implementation Assessment c, Risk Mitigation c, Risk Verification Assessment c, Risk in Change Assessment c
is in domain of
describes stage op, efficacy dp, has context op, has risk op, importance dp, potential loss dp, projected gain dp, projected value dp, value dp
is in range of
has project analysis op

Project Descriptionc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProjectDescription

A description of a Project.
Date:
14/06/2021
Authors:
Lucy McKenna
has super-classes
Data Entity c
is in range of
has project description op

Projected Gainc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProjectedGain

Identfied during the CUBE solution stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Loss or Gain c
is in domain of
textual description dp
is in range of
has projected gain op

Projected Reliability of Gainc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProjectedReliabilityOfGain

Identfied during the CUBE plan stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Reliability of Gain c
is in domain of
textual description dp
is in range of
has projected reliability of gain op

Projected Risk Ratingc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ProjectedRiskRating

Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Risk Rating c
is in range of
has projected risk op, has projected risk in change op

Questionnairec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Questionnaire

A set of structured questions which seek information on a topic of interest from respndents.
Date:
13/11/2019
Authors:
Yalemisew
is in domain of
has question op
is in range of
has questionnaire op, is question of op

Reliability of Gainc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ReliabilityOfGain

Identfied during the CUBE implement stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Projected Reliability of Gain c
is in domain of
textual description dp
is in range of
has reliability of gain op

Reportc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Report

A written account of an activity or investigation.
Date:
18/11/2019
Authors:
Yalemisew
has super-classes
Data Entity c
has sub-classes
Evidence Report c, Final Report c, Handover Report c, Report Template c, Status Report c
is in domain of
describes stage op
is in range of
has report op

Report Templatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ReportTemplate

A report format template.
Date:
15/09/2021
Authors:
Lucy McKenna
has super-classes
Report c
has sub-classes
Evidence Report Template c, Final Report Template c, Handover Report Template c, Status Report Template c

Riskc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Risk

Risk is the effect of uncertainty on objectives. It is measured in terms of consequences and likelihood. In the context of the HSE and its services, it is any condition or circumstance which may impact on the achievement of objectives and/or have a significant impact on the day-to-day operations. This includes failing to maximise any opportunity that would help the HSE or service meet its objectives.
Date:
22/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
is in domain of
has addtional required control op, has existing control op, has likelihood op, has primary impact category op, has risk coordinator op, has risk description op, has risk owner op, has risk rating op, has risk status op, risk source dp
is in range of
has risk op

Risk Assessmentc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessment

Identfied during the CUBE problem stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Project Analysis c
is in domain of
has potential loss op

Risk Assessment Record (Form)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessmentRecord

Used to collect risk information from a risk assessment, for example in a risk register.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Standard Risk Assessment Record c
is in domain of
has risk op, has risk assessor op
is in range of
has risk assessment record op

Risk Assessment Record Aer Lingusc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessmentRecordAerLingus

Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Standard Risk Assessment Record c

Risk Assessment Record DFBc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessmentRecordDFB

Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Standard Risk Assessment Record c
is in domain of
persons affected op, review comments dp, review date dp

Risk Assessment Record HSEc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessmentRecordHSE

Used to collect risk information from a risk assessment, for example in a risk register. Supports HSE risk assessment form fields.
Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Standard Risk Assessment Record c
has sub-classes
Risk Assessment Record SJH c
is in domain of
has HG/CHO/NAS/Function dp

Risk Assessment Record SJHc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskAssessmentRecordSJH

Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Risk Assessment Record HSE c
is in domain of
has approval status op, progress notes dp, review date dp

Risk Contextc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskContext

Establishing the context means to define the external and internal factors that the HSE and its services must consider when they manage risk. Used for risk description in ICC (impact, cause, context) format. Used to relate HSE concept of the context of a risk to CUBE concept of context.
Authors:
Rob Brennan
has super-classes
Context c
is in domain of
textual description dp
is in range of
has risk context op

Risk Descriptionc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskDescription

Desribes a risk in ICC (Impact, Cause, Context) format.
Date:
29/09/2020
has super-classes
Data Entity c
is in domain of
has cause op, has impact op, has risk context op, textual description dp
is in range of
has risk description op

Risk Implementation Assessmentc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskImplementationAssessment

Identfied during the CUBE plan stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Project Analysis c
is in domain of
has reliability of gain op, has risk in change op

Risk in Change Assessmentc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskInChangeAssessment

Identfied during the CUBE plan stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Project Analysis c
is in domain of
has projected reliability of gain op, has projected risk in change op

Risk Mitigationc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskMitigation

Identfied during the CUBE solution stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Project Analysis c
is in domain of
has efficacy op, has projected gain op, has projected risk op

Risk Ratingc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskRating

The estimated level of risk taking into consideration the existing controls in place. Defined by cross-referencing the impact severity and likelihood in the risk matrix.
Date:
22/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
has sub-classes
Projected Risk Rating c
is in domain of
has risk colour op
is in range of
has residual risk rating op, has risk in change op, has risk rating op
has members
Amber (Medium Risk) ni, Green (Low Risk) ni, Red (High Risk) ni, Unspecified Risk Rating ni

Risk Registerc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskRegister

A grouping of Risk Assessment Records (Forms).
Date:
14/04/2021
Authors:
Lucy McKenna
has super-classes
Access Control Entity c
is in domain of
has risk assessment record op

Risk Statusc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskStatus

Used to record the status of a risk: ‘Open’, ‘Monitor’ or ‘Closed’. Open, i.e. additional controls have been identified as necessary. Monitor, i.e. existing controls are deemed adequate to manage the risk but these need to be periodically reviewed. Closed, i.e. that the risk no longer exists e.g. where an unsuitable premises is replaced by a suitable one.
Date:
29/09/2020
Authors:
Rob Brennan
has super-classes
Data Entity c
is in range of
has risk status op
has members
Closed ni, Monitor ni, Open ni

Risk Typec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskType

The type of risk being assessed in a risk assessment form.
Date:
10/03/2021
Authors:
Lucy McKenna
has super-classes
Data Entity c
has sub-classes
Risk Type SJH c
is in range of
has risk type op
has members
Operational ni, Strategic ni

Risk Type SJHc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskTypeSJH

Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Risk Type c
has members
Governance ni, Human Resources ni, Patient Care and Safety (Provision of Care) ni

Risk Verification Assessmentc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RiskVerificationAssessment

Identfied during the CUBE plan stage.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Project Analysis c
is in domain of
has gain achieved op, has residual risk rating op

Sensemakingc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#SenseMaking

Sensemaking focuses on the different ways people understand the situation they are in and how they respond to it, while Culture represents the shared values, norms, expectations of various parties in the organization.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Aspect of Reality c

Severityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Severity

The extent of the damage to the institution, its people, and its goals and objectives resulting from a risk event occurring.
Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Impact Severity c
has sub-classes
Severity (Aer Lingus) c, Severity (DFB) c, Unspecified Severity c

Severity (Aer Lingus)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#SeverityAerLingus

Possible consequences of an unsafe event or condition, taking as reference the worst foreseeable situation. Severity scoring based on the Aer Lingus risk matrix.
Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Severity c
has members
Catastrophic ni, Hazardous ni, Major ni, Minor ni

Severity (DFB)c back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#SeverityDFB

Severity scoring based on the DFB risk matrix.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Severity c
has members
Catastrophic ni, Minor ni, Moderate ni, Serious ni, Very Serious ni

Socialc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Social

Dimension relating to a community or its organization.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
System Dimension c

Solution Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#SolutionStage

Describes a potential ‘to-be’ situation in which the problem dimensions are addressed with an effective solution or improvement. Identifies control measures that can prevent unwanted outcomes.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Stage

A stage is the stage on the cube questionnaire.
Date:
13/11/2019
Authors:
Yalemisew
has sub-classes
Develop Stage c, Implement Stage c, Plan and Prepare Stage c, Problem Stage c, Solution Stage c, Verify and Embed Stage c
is in range of
describes stage op

Standard Risk Assessment Recordc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#StandardRiskAssessmentRecord

Date:
08/06/2022
Authors:
Lucy McKenna
has super-classes
Risk Assessment Record (Form) c
has sub-classes
Risk Assessment Record Aer Lingus c, Risk Assessment Record DFB c, Risk Assessment Record HSE c
is in domain of
date of assessment dp, has dept/service site dp, has division dp, has hospital site/service op, has risk type op, unique ID number dp

Status Reportc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#StatusReport

A report that provides an update on the status of a project.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Report c

Status Report Templatec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#StatusReportTemplate

A template for a status report.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Report Template c

Sustainabilityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Sustainability

The extent to which the elements of the plan are being implemented in a way that sustains the expected performance level.
Date:
08/02/2021
Authors:
Rob Brennan
has super-classes
Obligation to Act Rating c
is in range of
has sustainability op
has members
High Sustainability ni, Low Sustainability ni, Medium Sustainability ni, Unspecified Sustainability ni

System Dimensionc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#SystemDimension

This focuses on the Goals, Process, Social, and Knowledge and Information.
Date:
13/11/2019
Authors:
Yalemisew
has sub-classes
Goal c, Information and Knowledge c, Process/Sequence c, Social c
is in range of
has dimension op

Unspecified Impactc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#UnspecifiedImpact

No impact level specified.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Impact c

Unspecified Likelihoodc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#UnspecifiedLikelihood

No likelihood specified.
Date:
28/09/2021
Authors:
Lucy McKenna
has super-classes
Likelihood c

Unspecified Severityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#UnspecifiedSeverity

No severity rating specified.
Date:
01/06/2022
Authors:
Lucy McKenna
has super-classes
Severity c

Userc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKPlatform#User

The user of the project can take three types: Owner, Collaborator, ReadOnlyUser.
A User of the ARK Platform.
has super-classes
Person c

Verify and Embed Stagec back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#VerifyEmbedStage

Verification determines whether or not the outcomes of a project fulfil the requirements established during the Solution Stage, taking into account the quality of planning and implementation. Embedding implies that a particular feature has become a permanent and noticeable feature of the system or organisation.
Date:
13/11/2019
Authors:
Yalemisew
has super-classes
Stage c

Viabilityc back to ToC or Class ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Viability

The extent to which the plan is able to work as intended and succeed in achieving its objectives.
Date:
18/12/2020
Authors:
Rob Brennan
has super-classes
Obligation to Act Rating c
is in range of
has viability op
has members
High Viability ni, Low Viability ni, Medium Viability ni, Unspecified Viability ni

Object Properties

assigned personop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#assignedPerson

The name of the person responsible for the action necessary to mitigate the risk. The Action Owner is responsible for reporting on progress relating to the achievement of the action assigned to them. The Action Owner should be one of the following, the Risk Owner, a member of the Risk Owner’s Management Team or the person to whom the Risk Owner reports.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Action c
has range
Person c

cites as authorityop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#citesAsAuthority

The cited evidence provides an authoritative description or definition of the subject under discussion.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

cites as potential solutionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#citesAsPotentialSolution

The cited evidence provides or contains a possible solution to the issues being discussed.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

cites as relatedop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#citesAsRelated

The evidence is related to the project.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

cites for informationop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#citesForInformation

The evidence is a source of information on the subject under discussion.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

derived from projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#derivedFromProject

Links a project to the project from which it was derived. A derivation is a transformation of a project into another, an update of a project resulting in a new one, or the construction of a new project based on a pre-existing project.
Date:
01/02/2021
Authors:
Lucy McKenna
has super-properties
has related project op, was Derived From op
has sub-properties
follow-up project of op, revision of op
has domain
Project c
has range
Project c

describes stageop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#describesStage

Links a Project Analysis to a particular Stage of a Project. Also links a Handover Report to its associated stages.
Date:
13/11/2019
Authors:
yalemisew
has domain
Project Analysis c
Report c
has range
Stage c

designed byop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#designedBy

The person who designed the project analysis and the cube questionnaire.
Date:
13/11/2019
Authors:
yalemisew
has domain
Project c
has range
Person c

discussesop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#discusses

The project discusses statements, ideas or conclusions presented in the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

follow-up project ofop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#FollowUpProjectOf

Links a follow-up project to its original project.
Date:
01/02/2021
Authors:
Lucy McKenna
has super-properties
derived from project op
has domain
Project c
has range
Project c

has addtional required controlop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#additionalControl

Links the additional controls and measures necessary to eliminate or further reduce the level of risk. Consider the hierarchy of controls: elimination/substitution/engineering/administrative/PPE. Try to consider both long and short-term measures.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Control c

has answerop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasAnswer

Represents and links the answer to the question.
Date:
13/11/2019
Authors:
yalemisew
has domain
Question c
has range
Answer c

has approval statusop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasApprovalStatus

Links an approval status to a risk verification assessment (Verify Stage).
Date:
21/10/2021
Authors:
Lucy McKenna
has domain
Risk Assessment Record SJH c
has range
Approval Status c

has artefactop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasArtefact

Associates an evidence to artefacts
Date:
20/05/2020
Authors:
Ademar
has domain
Evidence c
has range
Artefact c

has aspectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasAspect

A question has an aspect.
Date:
13/11/2019
Authors:
yalemisew
has domain
Question c
has range
Aspect of Reality c

has causeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasCause

Links a risk description to a cause.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk Description c
has range
Cause c

has communications Intelligence projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasCommunicationsIntelligenceProject

Links a ConOps (concept of operations) project to a project covering the communications and Intelligence system(s) of an organisation.
Date:
05/12/2024
Authors:
Junli Liang
Rob Brenan
Contributors:
Nick McDonald
has super-properties
has subproject op
has domain
Project c
has range
Project c

has contextop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasContext

The context of a project phase.
Date:
29/01/2020
Authors:
yalemisew
has sub-properties
has risk context op
has domain
Project c
Project Analysis c
has range
Context c

has datasetop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDataset

Evidence may contain dataset descriptions
Date:
15/05/2020
Authors:
Ademar
has domain
Artefact c
has range
Resource c

has deliverableop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDeliverable

Links an action and its deliverable
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Action c
has range
Deliverable c

has deliveryop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDelivery

Links Delivery to Project Analysis in Verification Stage
Date:
08/02/2021
Authors:
Rob Brennan
has range
Delivery c

has derived projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDerivedProject

Links a project to a derived project. A derivation is a transformation of a project into another, an update of a project resulting in a new one, or the construction of a new project based on a pre-existing project.
Date:
01/02/2021
Authors:
Lucy McKenna
has super-properties
has related project op, was Derived From op
has sub-properties
has follow-up project op, has revision op
has domain
Project c
has range
Project c

has dimensionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDimension

A question has dimension.
Date:
18/11/2019
Authors:
yalemisew
has domain
Question c
has range
System Dimension c

has efficacyop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasEfficacy

Links a Efficacy to Project Analysis in Solution Stage
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Mitigation c
has range
Efficacy c

has evidenceop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasEvidence

An answer has its own evidence.
Date:
18/11/2019
Authors:
yalemisew
Contributors:
Ademar

has evidence ruleop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasEvidenceRule

Represents and links an evidence rule with a question.
Date:
18/11/2019
Authors:
yalemisew
has domain
Answer c

has existing controlop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasExistingControl

Links a Risk with a description of what administrative/procedural/existing controls measures are currently in place to mitigate the risk. Include engineering controls, policies, procedures, protocols, guidelines (clinical and non-clinical), training, emergency arrangements, preventative maintenance controls etc. When examining existing control measures, consider the adequacy, method of implementation and level of effectiveness in eliminating or minimising risk to the lowest practicable level.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Control c

has follow-up projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasFollowUpProject

Links a project to a follow-up project.
Date:
01/02/2021
Authors:
Lucy McKenna
has super-properties
has derived project op
has domain
Project c
has range
Project c

has gain achievedop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasGainAchieved

Connects risk verifaction assessment with gain achieved
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Verification Assessment c
has range
Gain Achieved c

has hospital site/serviceop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasSiteService

Links a Risk Assessment to an organisation or a hospital site/service.
Date:
29/09/2020
Authors:
Rob Brennan

has impactop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasImpact

Links a Risk to its Impact Severity. What Impact Severity score would you give the risk?
Date:
22/09/2020
Authors:
Rob Brennan
has domain
Risk Description c
has range
Impact c

has importanceop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasImportance

Links an Importance to Project Analysis in Problem Stage
Date:
18/12/2020
Authors:
Rob Brennan
has range
Importance c

has likelihoodop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasLikelihood

Links a risk to the likelihood of it occurring. What likelihood score would you give the risk?
Date:
22/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Likelihood (HSE) c

has macrosystem projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasMacrosystemProject

Links a ConOps (concept of operations) project to a project covering the macrosystem(s) or strategic level of an organisation.
Date:
05/12/2024
Authors:
Junli Liang
Rob Brenan
Contributors:
Nick McDonald
has super-properties
has subproject op
has domain
Project c
has range
Project c

has mechanismop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasMechanism

This property links the project phase with Mechanism.
Date:
29/01/2020
Authors:
yalemisew
has range
Mechanism c

has mesosystem projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasMesosystemProject

Links a ConOps (concept of operations) project to a project covering the mesosystem(s) or tactical level of an organisation.
Date:
05/12/2024
Authors:
Junli Liang
Rob Brenan
Contributors:
Nick McDonald
has super-properties
has subproject op
has domain
Project c
has range
Project c

has Microsystem Projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasMicrosystemProject

Links a ConOps (concept of operations) project to a project covering the microsystem(s) or operational level of an organisation.
Date:
05/12/2024
Authors:
Junli Liang
Rob Brenan
Contributors:
Nick McDonald
has super-properties
has subproject op
has domain
Project c
has range
Project c

has organisational unitop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasOrganisationalUnit

Links an Organisation with an organisational unit or department within the Organisation.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Organisation c
has range
Organisational Unit c

has outcomeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasOutcome

Represents the outcome of the phases of a project.
Date:
29/01/2020
Authors:
yalemisew
has range
Outcome c

has potential lossop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasPotentialLoss

Links a Potential Loss to Risk Assessment (Project Analysis in Problem Stage)
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Assessment c
has range
Potential Loss c

has primary impact categoryop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasPrimaryImpactArea

Links a Risk Assessment with a Primary Impact Category taken from the HSE Risk Assessment Tool, Impact Table.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Primary Impact Category c

has priorityop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasPriority

Used to link a CUBE question to a priority.
Date:
12/08/2021
Authors:
Lucy McKenna
has range
Priority c

has project analysisop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectAnalysis

Relates a project to an analysis of the project.
has domain
Project c
has range
Project Analysis c

has project descriptionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectDescription

Links a project to its description.
Date:
14/06/2021
Authors:
Lucy McKenna
has domain
Project c
has range
Project Description c

has projected gainop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectedGain

Links a Risk Mitigation to Project Analysis in Solution Stage
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Mitigation c
has range
Projected Gain c

has projected reliability of gainop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectedReliabilityOfGain

Links a Risk in Change to Project Analysis in
Date:
18/12/2020
Authors:
Rob Brennan

has projected riskop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectedRisk

Links a Risk in Change to Project Analysis in Plan stage
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Mitigation c
has range
Projected Risk Rating c

has projected risk in changeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasProjectedRiskInChange

Links a Project Analysis in Plan Stage to a Risk
Date:
18/12/2020
Authors:
Rob Brennan

has questionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasQuestion

Links a CUBE questionnaire to a CUBE question.
Date:
13/11/2019
Authors:
yalemisew
has domain
Questionnaire c
has range
Question c

has questionnaireop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasQuestionnaire

Used to link a Project with a CUBE analysis questionnaire.
Date:
17/11/2020
Authors:
Rob Brennan
has range
Questionnaire c

has related conceptop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRelatedConcept

Links entites in ARK Cube to related concepts in ARK terminologies.
Authors:
Ademar
has domain
Data Entity c
has range
Concept c

has related projectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRelatedProject

Links one project to another in order to indicate that they are related in some way.
Date:
15/12/2021
Authors:
Lucy McKenna
has sub-properties
derived from project op, has derived project op, has subproject op, has superproject op
has domain
Project c
has range
Project c

has reliability of gainop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasReliabilityOfGain

Connects a risk implimentation assessment with a reliability of gain value
Date:
12/01/2021
Authors:
Rob Brennan

has reportop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasReport

Links a Project to a Report.
Date:
14/09/2021
Authors:
Lucy McKenna
has domain
Project c
has range
Report c

has residual risk ratingop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasResidualRiskRating

Links a Risk Rating to a Risk
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Verification Assessment c
has range
Risk Rating c

has revisionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRevision

Links a project to a revised version of the project.
Date:
01/02/2021
Authors:
Lucy McKenna
has super-properties
has derived project op, was Revision Of op
has domain
Project c
has range
Project c

has riskop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRisk

Links a Risk Assessment Record, a Project, a Project Analysis or a Stage to a risk.
Date:
29/09/2020
Authors:
Rob Brennan

has risk assessment recordop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskAssessmentRecord

Links a Risk Register to a Risk Assessment Record.
Authors:
2021-04-15T22:46:04+00:00
Lucy McKenna
has domain
Risk Register c
has range
Risk Assessment Record (Form) c

has risk assessorop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskAssessor

The person(s) who completed the risk assessment.
Date:
04/05/2021
Authors:
Lucy McKenna
has domain
Risk Assessment Record (Form) c
has range
Person c

has risk colourop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskColour

Links a risk class with a specific colour.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk Rating c

has risk contextop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskContext

Specialised sub-property of hasContext used for linking a RiskDescription with a RiskContext.
Date:
01/01/2020
Authors:
Rob Brennan
has super-properties
has context op
has domain
Risk Description c
has range
Risk Context c

has risk coordinatorop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskCoordinator

The role of the Risk Coordinator is to assist with the initial assessment of the risk by providing expertise on the subject matter of the risk being assessed and following this to assist with its ongoing review and monitoring.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Person c

has risk descriptionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskDescription

Links a Risk to its description. When describing risk it is important to describe the risk using the ‘ICC’ (impact, cause, context) approach. Describe the potential ‘IMPACT’ if the risk were materialised. Describe the ‘CAUSAL FACTORS’ that could result in the risk materialising. Ensure that the ‘CONTEXT’ of the risk is clear, e.g. is the risk ‘target’ well defined (e.g. staff, service user), department, hospital etc.) and the ‘nature’ of the risk clear (e.g. financial, safety, physical loss, perception, etc.).
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Risk Description c

has risk in changeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskInChange

Links a Project Analysis in Implement Stage to Risk
Date:
18/12/2020
Authors:
Rob Brennan
has domain
Risk Implementation Assessment c
has range
Risk Rating c

has risk ownerop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskOwner

All risks require assignment of a Risk Owner and it is the responsibility of the Risk Owner to ensure that the risk is assessed and managed in line with organisational policy. This includes ensuring that any actions identified as required to manage the risk have been assigned to an Action Owner along with an agreed date for completion of the action. The Risk Owner is normally the Manager of the area/service in which the risk is identified. It is the responsibility of the Risk Owner to notify risks or actions where appropriate. This is the individual who will be held accountable for the risk and its effective control.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Person c

has risk ratingop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskRating

Links a Risk to its Risk Rating. Multiplying the inherent Impact Severity by the Likelihood will give the risk rating.
Date:
22/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Risk Rating c

has risk statusop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskStatus

Links a Risk to its current status: ‘Open’, ‘Monitor’ or ‘Closed’. Open, i.e. additional controls have been identified as necessary. Monitor, i.e. existing controls are deemed adequate to manage the risk but these need to be periodically reviewed. Closed, i.e. that the risk no longer exists e.g. where an unsuitable premises is replaced by a suitable one.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c
has range
Risk Status c

has risk typeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasRiskType

Links a risk to the specific type of risk being assessed.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Standard Risk Assessment Record c
has range
Risk Type c

has subprojectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasSubProject

Links a parent project to a child project. A Project can have one or more subprojects.

has subquestionop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasSubquestion

Represents and links the subquestion of a question
Date:
27/01/2020
Authors:
yalemisew
has domain
Question c
has range
Question c

has superprojectop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasSuperProject

Links a child project to its parent project.
Date:
15/12/2021
Authors:
Lucy McKenna
has super-properties
has related project op
has domain
Project c
has range
Project c

has sustainabilityop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasSustainability

Links a Sustainability rating to Project Analysis in Implement Stage
Date:
08/02/2021
Authors:
Rob Brennan
has range
Sustainability c

has viabilityop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#has_viability

Links a Visbility rating to Project Analysis in Plan Stage
Date:
18/12/2020
Authors:
Rob Brennan
has range
Viability c

holds postop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#holdsPost

Links a Person to their Post or position within an Organisation.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Person c
has range
Post c

informantop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#informant

The person who provides information about the project questions.
Date:
27/01/2020
Authors:
yalemisew
has range
Person c

is question ofop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#isQuestionOf

Links a CUBE question to a CUBE questionnaire.
Date:
15/12/2021
Authors:
Lucy McKenna
has domain
Question c
has range
Questionnaire c

member ofop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#memberOf

Links a Person to an Organisation or an Organisational Unit.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Person c
has range
Organisation c

obtains support fromop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#obtainsSupportFrom

The project obtains intellectual or factual support from the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

persons affectedop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#personsAffected

Links how many people affected to a DFB Rsk Assessment form
Date:
21/10/2021
Authors:
Lucy McKenna

post inop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#postIn

Links a Post to an Organisation.
Date:
14/04/2021
Authors:
Lucy McKenna
has domain
Post c
has range
Organisation c

refutesop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#refutes

The project refutes statements, ideas or conclusions presented in the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

related to contextop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#relatedToContext

If this property is present, then this data entity describes information that is related to the Context of the problem, system or risk being analysed. This may be used for Rationalist analysis.
Date:
23/05/2023
Authors:
Junli Liang
Rob Brennan
has domain
Data Entity c
has range
Context c

related to mechanismop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#relatedToMechanism

If this property is present, then this data entity describes information that is related to the Mechanism of the problem, system or risk being analysed. This may be used for Rationalist analysis.
Date:
23/05/2023
Authors:
Junli Liang
Rob Brennan
has domain
Data Entity c
has range
Mechanism c

related to outcomeop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#relatedToOutcome

If this property is present, then this data entity describes information that is related to the Outcome of the problem, system or risk being analysed. This may be used for Rationalist analysis.
Date:
23/05/2023
Authors:
Junli Liang
Rob Brennan
has domain
Data Entity c
has range
Outcome c

report analysis toop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#reportAnalysisTo

The person/office to whom the outcome of an analysis is reported.
Date:
13/11/2019
Authors:
yalemisew
has range
Organisational Unit c
Person c

reports toop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#reportsTo

A reporting relationship between Persons or Posts in an Organisation.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Person c
Post c
has range
Person c
Post c

revision ofop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#revisionOf

Links a revised version of a project to its original.
Date:
01/02/2022
Authors:
Lucy McKenna
has super-properties
derived from project op, was Revision Of op
has domain
Project c
has range
Project c

supportsop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#supports

The project supports statements, ideas or conclusions presented in the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

updatesop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#updates

The project updates statements, ideas, hypotheses or understanding presented in the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

uses data fromop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#usesDataFrom

The project uses data presented in the evidence.
Date:
14/09/2021
Authors:
Lucy McKenna
has super-properties
has evidence op
has domain
Data Entity c
has range
Evidence c

works withop back to ToC or Object Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#worksWith

Links people who work together within, or across, Organisations.
Date:
10/03/2021
Authors:
Lucy McKenna
has domain
Person c
has range
Person c

Data Properties

analytics datadp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#analyticsData

Data that can support/comes from some analytics.
Date:
27/01/2020
Authors:
yalemisew

answer textdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#answerText

The a textual answer to the cube question.
Date:
13/11/2019
Authors:
yalemisew
has domain
Answer c

artefact textdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#artefactText

A textual description of an artefact.
Date:
20/05/2020
Authors:
Ademar
has domain
Artefact c
has range
Literal

commentdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#comment

A comment provided about the project.
Date:
25/02/2020
Authors:
yalemisew

data statusdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#dataStatus

The status of the data. Deleted when the data is deleted by the user.
has domain
Thing c
Access Control Entity c
Data Entity c
has range
Literal

date of assessmentdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#assessmentDate

The date of the risk assessment.
Date:
29/09/2020
Authors:
Rob Brennan

design datedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#designDate

The date on which the project is designed.
Date:
13/11/2019
Authors:
yalemisew

due datedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#dueDate

Used to link an Action to the date by which implementation of the actions to mitigate the risk are due.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Action c
has range
date Time

efficacydp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#efficacy

The efficacy of the solution.
has domain
Project Analysis c
has range
Literal

evidence ruledp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#evidenceRule

A rule provided to evaluate evidence.
Date:
27/01/2020
Authors:
yalemisew
has domain
Evidence c

evidence textdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#evidenceText

Text which describes the evidence.
Date:
03/02/2020
Authors:
yalemisew
Contributors:
Ademar
has domain
Evidence c
has range
Literal

filedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#file

Path to file.
Date:
15/05/2020
Authors:
Ademar
has domain
Artefact c
has range
Literal

handover todp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#handoverTo

The person, department or unit to whom a project is handed over.
Date:
15/09/2021
Authors:
Lucy McKenna
has super-properties
top Data Property dp
has domain
Access Control Entity c
Data Entity c

has dept/service sitedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDeptServiceSite

Links a risk to a department, service or station e.g. Maternity Service/St Joseph’s Residential Unit.
Date:
29/09/2020
Authors:
Rob Brennan

has distributiondp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDistribution

The people, groups, departments or organisations with whom a report can be shared/distributed.
Date:
15/09/2021
Authors:
Lucy McKenna

has divisiondp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasDivision

Links a risk to a division e.g. Social Care, Primary Care, Acute Hospital, Mental Health, Health & Wellbeing, HR etc.
Date:
29/09/2020
Authors:
Rob Brennan

has HG/CHO/NAS/Functiondp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hasHgChoNasFunction

Links a risk to a specfic Hospital Group, Community Healthcare Organisation, National Ambulance Service or Function e.g. RCSI, CHO8.
Date:
29/09/2020
Authors:
Rob Brennan

importancedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#importance

Importance of the problem under analysis.
has domain
Project Analysis c
has range
Literal

is projecteddp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#isProjected

Used to annotate a value, for example a risk, that is predicted or estimated.
Date:
18/12/2020
Authors:
Rob Brennan

namedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#name

Holds the name of an entity or agent as a string.
Date:
29/09/2020
Authors:
Rob Brennan
Contributors:
Lucy McKenna

potential lossdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#potentialLoss

Potential loss due to the problem.
has domain
Project Analysis c
has range
Literal

progress notesdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#progressNotes

Date:
21/10/2021
Authors:
Lucy McKenna
has domain
Risk Assessment Record SJH c
has range
Literal

project statusdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#projectStatus

The current status of a project
has domain
Project c
has range
Literal

projected gaindp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#projectedGain

The gain achieved by the project.
has domain
Project Analysis c
has range
Literal

projected valuedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#projectedValue

The projected value of the project.
has domain
Project Analysis c
has range
Literal

question textdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#questionText

The text of the cube question. This represents the actual question asked.
Date:
13/11/2019
Authors:
yalemisew
has domain
Question c

review commentsdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#reviewComments

Date:
08/06/2022
Authors:
Lucy McKenna
has domain
Risk Assessment Record DFB c
has range
Literal

review datedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#reviewDate

Date:
21/10/2021
Authors:
Lucy McKenna

risk sourcedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#riskSource

The source from which the risk was identified e.g. Incident Management, Audit, Health and Safety Risk Assessment, Inspection Report, Complaint.
Date:
29/09/2020
Authors:
Rob Brennan
has domain
Risk c

signaturedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#signature

Used to hold a signature of the responsible person in a risk assessment.
Date:
29/09/2020
Authors:
Rob Brennan
has super-properties
top Data Property dp
has domain
Person c

textual descriptiondp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#textualDescription

Used for textual description of a risk impact or other type.
Date:
29/09/2020
Authors:
Rob Brennan

unique ID numberdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#riskAssessmentId

The identifier of a Risk Assessment.
Date:
29/09/2020
Authors:
Rob Brennan

valid fromdp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#validFrom

The date that a data entity is valid from.
Date:
02/12/2021
Authors:
Lucy McKenna
has domain
Data Entity c
has range
date Time

valid todp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#validTo

The date that a data entity is valid to.
Date:
02/12/2021
Authors:
Lucy McKenna
has domain
Data Entity c
has range
date Time

valuedp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#value

An entity’s value is created, preserved, eroded or realized based on the relationship between the benefits derived from resources deployed and the cost of those resources.
has domain
Project Analysis c
has range
Literal

versiondp back to ToC or Data Property ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#version

The version of the project.
Date:
13/11/2019
Authors:
yalemisew
has domain
Project c

Named Individuals

:ni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#

belongs to
Catalog c

Access Serviceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#AccessService

belongs to
Access Service c
has facts
endpoint Description ap "Access Risk Knowledge Cube Ontology - dcat:AccessService definition"@en
endpoint U R L ap ontology.ttl ep

Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#adversePublicityReputation

Risks to the public reputation of the organisation and their effects.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Almost Certainni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#almostCertainDFB

Inadequate health and safety controls, an accident will occur. Probability 90-100%.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Likelihood (DFB) c
has facts
probability dp "0.95"

Almost Certainni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#almostCertainHSE

Probability: 99%. Actual Frequency: At least monthly.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Likelihood (HSE) c
has facts
actual Frequency dp "At least monthly"
probability dp "0.99"

Amber (Medium Risk)ni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumRisk

Amber (medium risk) risk ratings are trickier in that they are not intolerable (high risk) or acceptable (low risk). Whilst all reasonable efforts should be taken to reduce the risk to a low rating this may not be possible given constraints within the overall system or indeed by applying the additional effort required to mitigate it further other opportunities will be lost. Such risks require consideration by the Management Team and it may be that a decision is taken to accept the risk but keep it under review (monitor) with an option to open it for further management in the future.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Risk Rating c

Awaiting Final Approvalni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#awaitingFinalApproval

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Being Reviewedni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#beingReviewed

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#businessContinuity

Risks which threaten the organisation’s ability to deliver its services and serve the community.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Catastrophicni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#catastrophicSeverityAerLingus

Plain: Fatalities or destruction of equipment / loss of aircraft. Qualified (Injury): Fatal. Qualified (Damage): Complete destruction of equipment, grounding of operation. Qualified (ICAO): Total loss or hull loss. Qualified (Operational Impact): Prolonged fleet grounding. Organisational Impact: Change in public perception of Airline's reputation.
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Severity (Aer Lingus) c

Catastrophicni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#catastrophicSeverityDFB

Death or multiple irreversible injuries.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Severity (DFB) c

Closedni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#closed

Closed, i.e. that the risk no longer exists e.g. where an unsuitable premises is replaced by a suitable one.
belongs to
Risk Status c

Closedni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#closedApproval

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#compliance

Risks associated with compliance with requirements in relation to the standards set out in relation to the organisation and delivery of high quality services i.e. Statutory, Clinical, Professional and Management Standards.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Datasetni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Dataset

belongs to
Dataset c
has facts
description ap "Access Risk Knowledge Cube Ontology - dcat:Dataset definition"@en
title ap "Access Risk Knowledge Cube Ontology - dcat:Dataset definition"@en
distribution ap Distribution ni

Distributionni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Distribution

belongs to
Distribution c
has facts
format ap "text/turtle"
access Service ap Access Service ni
access U R L ap ontology.ttl ep
byte Size ap "450KB"
download U R L ap ontology.ttl ep

Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#environment

Risks which threaten the prevention, limitation, elimination, abatement or reduction of environmental pollution and the preservation of a quality environment.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Extremeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Extreme

Extreme Impact - Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEAdversePublicityReputation

National/International media/adverse publicity, > than 3 days. Editorial follows days of news stories & features in National papers.Public confidence in the organisation undermined.HSE use of resources questioned. CEO’s performance questioned. Calls for individual HSE officials to be sanctioned. Taoiseach/Minister forced to comment or intervene. Questions in the Dáil. Public calls (at national level) for specific remedial actions to be taken. Court action. Public (independent) Inquiry.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEBusinessContinuity

Permanent loss of core service or facility. Disruption to facility leading to significant ‘knock on’ effect.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSECompliance

Gross failure to meet external standards. Repeated failure to meet national norms and standards/regulations. Severely critical report with possible major reputational or financial implications.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEEnvironment

Toxic release affecting off-site with detrimental effect requiring outside assistance.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEFinance

>2.0% budget deficit.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEHarmToAPerson

Incident leading to death or major permanent incapacity. Event which impacts on large number of service users or member of the public. Permanent psychosocial functioning incapacity.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEObjectivesProjects

Inability to meet project objectives. Reputation of the organisation seriously damaged.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extreme Impact - Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremeImpactHSEServiceUserExperience

Totally unsatisfactory service user outcome resulting in long term effects, or extremely poor experience of care provision.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Extreme c

Extremely Improbableni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremelyImprobableAerLingus

Plain: Unlikely to occur. Qualified (Calendar): No event in more than 10 years. Qualified (Context): Has occurred in industry but not in Aer Lingus. Qualified (per flight): Less than 1 out of 750,000 flights. Probability: >2 x 10^(minus 6).
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Likelihood (Aer Lingus) c
has facts
probability dp "2.00E-06"

Extremely Remoteni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#extremelyRemoteAerLingus

Plain: Not llikely to, but could, occur. Qualified (Calendar): More than twice a year. Qualified (Context): Sporadic occurrence in Aer Lingus. Qualified (per flight): 1 out of 35,000 flights. Probability: >3 x 10^(minus 5).
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Likelihood (Aer Lingus) c
has facts
probability dp "3.00E-05"

Final Approvalni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#finalApproval

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#finance

Risks relating to procedures/systems/accounting records which expose the organisation to financial risks, including risks to assets.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Governanceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#Governance

Date:
04/05/2021
Authors:
Lucy McKenna
belongs to
Risk Type SJH c

Green (Low Risk)ni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowRisk

belongs to
Risk Rating c

Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#harmToAPerson

Risks which may contribute to the physical or psychological harm of an individual.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Hazardousni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#hazardousSeverityAerLingus

Plain: A large reduction in safety margins, physical distress or a workload such that operators cannot be relied upon to perform their tasks accurately or completely. Serious injury. Mahor equipment damage. Qualified (Injury): Serious injuries and/or permanent disability with serious illness or health impairment. Qualified (Damage): Significant damage leading to prolonged loss of service, cost impact. Qualified (ICAO): Accident with serious injuries and/or significant damage to aircraft. Qualified (Operational Impact): Fleet grounded for a brief period. Organisational Impact: Extended national or international media coverage.
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Severity (Aer Lingus) c

High Deliveryni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highDelivery

belongs to
Delivery c

High Efficacyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highEfficacy

belongs to
Efficacy c

High Importanceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highImportance

belongs to
Importance c

High Priorityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highPriority

belongs to
Priority c

High Sustainabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highSustainability

belongs to
Sustainability c

High Viabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highViability

belongs to
Viability c

Human Resourcesni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#HumanResources

Date:
04/05/2021
Authors:
Lucy McKenna
belongs to
Risk Type SJH c

In Holding, Awaiting Reviewni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#inHoldingAwaitingReview

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Likelyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#likelyDFB

Inadequate health and safety controls in place. If conditions remain unchanged there is a high probability of an accident. Probability: 60-90%.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Likelihood (DFB) c
has facts
probability dp "0.75"

Likelyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#likelyHSE

Probability: 75%. Actual Frequency: Bimonthly.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Likelihood (HSE) c
has facts
actual Frequency dp "Bimonthly"
probability dp "0.75"

Low Deliveryni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowDelivery

belongs to
Delivery c

Low Efficacyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowEfficacy

belongs to
Efficacy c

Low Importanceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowImportance

belongs to
Importance c

Low Priorityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowPriority

belongs to
Priority c

Low Sustainabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowSustainability

belongs to
Sustainability c

Low Viabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#lowViability

belongs to
Viability c

Majorni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#major

Majorni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorSeverityAerLingus

Plain: A significant reduction in safety margins, a reduction in the ability of the operators to cope with adverse operating conditions as a result of increase in workload, or as a result of conditions impairing their efficiency. Serious incident. Injury to persons. Qualified (Injury): Serious but non-permanent injuries (e.g. lost time injury). Qualified (Damage): Damage leading to delay or operational impact. Qualified (ICAO): Serious incident with injuries or substantial damage. Qualified (Operational Impact): Aircraft grounded temporarily. Organisational Impact: Short term negative media coverage.
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Severity (Aer Lingus) c

Major Impact - Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEAdversePublicityReputation

National media/adverse publicity, less than 3 days. News stories & features in national papers. Local media – long term adverse publicity.Public confidence in the organisation undermined. HSE use of resources questioned. Minister may make comment. Possible questions in the Dáil. Public calls (at national level) for specific remedial actions to be taken possible HSE review/investigation.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEBusinessContinuity

Sustained loss of service which has serious impact on delivery of service user care or service resulting in major contingency plans being involved.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSECompliance

Repeated failure to meet external standards. Failure to meet national norms and standards/Regulations (e.g. Mental Health, Child Care Act etc). Critical report or substantial number of significant findings and/or lack of adherence to regulations.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEEnvironment

Release affecting minimal off-site area requiring external assistance (fire brigade, radiation, protection service, etc.)
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEFinance

1.0-2.0% budget deficit.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEHarmToAPerson

Major injuries/long term incapacity or disability (loss of limb) requiring medical treatment and/or counselling. Impaired psychosocial functioning greater than six months.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEObjectivesProjects

Significant project over-run.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Major Impact - Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#majorImpactHSEServiceUserExperience

Unsatisfactory service user experience related to poor treatment resulting in long term effects.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Major c

Medium Deliveryni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumDelivery

belongs to
Delivery c

Medium Efficacyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumEfficacy

belongs to
Efficacy c

Medium Importanceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumImportance

belongs to
Importance c

Medium Priorityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumPriority

belongs to
Priority c

Medium Sustainabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumSustainability

belongs to
Sustainability c

Medium Viabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#mediumViability

belongs to
Viability c

Minorni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorSeverityAerLingus

Plain: Nusance event: Operating limitations, Use of emergency procedures, Minor incident with little consequences. Does not impede a person, aurcraft or process from continuing to operate. Qualified (Injury): First aid treatment only. Qualified (Damage): Little adverse consequence, minor damage not preventing work. Qualified (ICAO): Incident with minor damage or injury. Qualified (Operational Impact): Minor delay. Organisational Impact: No media coverage.
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Severity (Aer Lingus) c

Minorni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorSeverityDFB

No injury.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Severity (DFB) c

Minor Impact - Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEAdversePublicityReputation

Local media coverage – short term. Some public concern. Minor effect on staff morale/public attitudes. Internal review necessary.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEBusinessContinuity

Short term disruption to service with minor impact on service user care.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSECompliance

Single failure to meet internal PPPGs. Minor recommendations which can be easily addressed by local management.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEEnvironment

On site release contained by organisation.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEFinance

0.33-0.5% budget deficit.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEHarmToAPerson

Minor injury or illness, first aid treatment required. <3 days absence. <3 days extended hospital stay. Impaired psychosocial functioning greater than 3 days less than one month.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEObjectivesProjects

Minor reduction in scope, quality or schedule.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Minor Impact - Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#minorImpactHSEServiceUserExperience

Unsatisfactory service user experience related to less than optimal treatment and/or inadequate information, not being to talked to & treated as an equal; or not being treated with honesty, dignity & respect – readily resolvable.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Minor c

Moderateni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateSeverityDFB

Injury / harm that is of a temporary nature and results in less than 3 days absence.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Severity (DFB) c

Moderate Impact - Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEAdversePublicityReputation

Local media – adverse publicity.Significant effect on staff morale & public perception of the organisation. Public calls (at local level) for specific remedial actions. Comprehensive review/investigation necessary.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEBusinessContinuity

Some disruption in service with unacceptable impact on service user care. Temporary loss of ability to provide service.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSECompliance

Repeated failure to meet internal PPPGs. Important recommendations that can be addressed with an appropriate management action plan.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEEnvironment

On site release contained by organisation.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEFinance

0.5-1.0% budget deficit.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEHarmToAPerson

Significant injury requiring medical treatment e.g. Fracture and/or counselling. Agency reportable, e.g. HSA, Gardaí (violent and aggressive acts). >3 Days absence. 3-8 Days extended hospital Stay. Impaired psychosocial functioning greater than one month less than six months.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEObjectivesProjects

Reduction in scope or quality of project; project objectives or schedule.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Moderate Impact - Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#moderateImpactHSEServiceUserExperience

Unsatisfactory service user experience related to less than optimal treatment resulting in short term effects (less than 1 week).
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Moderate c

Monitorni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#monitor

Monitor, i.e. existing controls are deemed adequate to manage the risk but these need to be periodically reviewed.
belongs to
Risk Status c

Negligible Impact - Adverse Publicity/Reputationni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEAdversePublicityReputation

Rumours, no media coverage. No public concerns voiced.Little effect on staff morale. No review/investigation necessary.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Business Continuityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEBusinessContinuity

Interruption in a service which does not impact on the delivery of service user care or the ability to continue to provide service.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Complianceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSECompliance

Minor non-compliance with internal PPPGs. Small number of minor issues requiring improvement.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Environmentni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEEnvironment

Nuisance Release.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Financeni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEFinance

0.33% budget deficit.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Harm to a Personni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEHarmToAPerson

Adverse event leading to minor injury not requiring first aid. No impaired Psychosocial functioning.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEObjectivesProjects

Barely noticeable reduction in scope, quality or schedule.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Negligible Impact - Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#negligibleImpactHSEServiceUserExperience

Reduced quality of service user experience related to inadequate provision of information.
Date:
25/08/2021
Authors:
Lucy McKenna
belongs to
Negligible c

Objectives/Projectsni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#ObjectivesProjects

Risks relating to the procedures/technologies etc. employed to achieve particular objectives and projects.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Openni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#open

Open, i.e. additional controls have been identified as necessary.
belongs to
Risk Status c

Operationalni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#operational

Operational risks relate to the day-to-day delivery of activities, operational business plans and objectives. Operational risks typically have a short-term focus. Whilst they may impact a number of areas of the service, this does not necessarily make them a strategic risk. Operational risks may have the ability to impact strategic and other operational risks.
Date:
10/03/2021
Authors:
Lucy McKenna
belongs to
Risk Type c

Patient Care and Safety (Provision of Care)ni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#PatientCareAndSafety

Date:
04/05/2021
Authors:
Lucy McKenna
belongs to
Risk Type SJH c

Possibleni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#possibleDFB

If the situation is not well managed an accident is likely to occur. Probability 30-60%.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Likelihood (DFB) c
has facts
probability dp "0.45"

Possibleni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#possibleHSE

Probability: 50%. Actual Frequency: Occurs every 1-2 years.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Likelihood (HSE) c
has facts
actual Frequency dp "Occurs every 1-2 years"
probability dp "0.5"

Probableni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#probableAerLingus

Plain: Likely to occur. Qualified (Calendar): More than once a week. Qualified (Context): Has occurred many times in Aer Lingus. Qualified (per flight): 1 out of 1500 flights. Probability: >7 x 10^(minus 4).
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Likelihood (Aer Lingus) c
has facts
probability dp "7.00E-04"

Rareni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#rareDFB

Accidents could only happen under certain conditions. The situation is very well controlled, and all reasonable precautions have been taken. Probability: <10%.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Likelihood (DFB) c
has facts
probability dp "0.1"

Rare/Remoteni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#rareRemoteHSE

Probability: 1%. Actual Frequency: Occurs every 5 years or more.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Likelihood (HSE) c
has facts
actual Frequency dp "Occurs every 5 years"
probability dp "0.01"

Red (High Risk)ni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#highRisk

belongs to
Risk Rating c

Rejectedni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#rejected

Date:
03/12/2021
Authors:
Lucy McKenna
belongs to
Approval Status c

Remoteni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#remoteAerLingus

Plain: Could occur, or has occurred. Qualified (Calendar): More than once a month. Qualified (Context): Has occurred in Aer Lingus. Qualified (per flight): 1 out of 6000 flights. Probability: >2 x 10^(minus 4).
Date:
01/06/2022
Authors:
Lucy McKenna
belongs to
Likelihood (Aer Lingus) c
has facts
probability dp "2.00E-04"

Seriousni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#seriousSeverityDFB

Injury / harm that is of a temporary nature and results in more than 3 days absence but not more than 28 days.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Severity (DFB) c

Service User Experienceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#serviceUserExperience

Risks which threaten the delivery of a service provision to service users in terms of quality, in a comfortable, caring and safe environment, delivered in a calm and reassuring way; having information to make choices, to feel confident and to feel in control; being listened to and talked to as an equal; being treated with honesty, respect and dignity.
Date:
29/01/2021
Authors:
Rob Brennan
belongs to
Primary Impact Category c

Strategicni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#strategic

A strategic risk has the ability to impact on the achievement/delivery of the organisation's strategic objectives/directions. Strategic risks relate to the highest level of objective for the organisation, which typically have a long-term focus and are linked to the organisation's strategic plan.
Date:
10/03/2021
Authors:
Lucy McKenna
belongs to
Risk Type c

Unlikelyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unlikelyDFB

The situation is well under control, but occasional lapses could occur. Probability 10-30%.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Likelihood (DFB) c
has facts
probability dp "0.2"

Unlikelyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unlikelyHSE

Probability: 10%. Actual Frequency: Occurs every 2-5 years.
Date:
29/09/2020
Authors:
Rob Brennan
belongs to
Likelihood (HSE) c
has facts
actual Frequency dp "Occurs every 2-3 years"
probability dp "0.1"

Unspecified Deliveryni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedDelivery

belongs to
Delivery c

Unspecified Efficacyni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedEfficacy

belongs to
Efficacy c

Unspecified Importanceni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedImportance

belongs to
Importance c

Unspecified Primary Impact Categoryni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedImpactCategory

No primary impact category specified.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Primary Impact Category c

Unspecified Priorityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedPriority

belongs to
Priority c

Unspecified Risk Ratingni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedRiskRating

belongs to
Risk Rating c

Unspecified Severityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedSeverity

No severity level specified.
Date:
28/09/2021
Authors:
Lucy McKenna

Unspecified Sustainabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedSustainability

belongs to
Sustainability c

Unspecified Viabilityni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#unspecifiedViability

belongs to
Viability c

Very Seriousni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#verySeriousSeverityDFB

Injury resulting in more than 28 days absence / irreversible injury / permanent disablement.
Date:
28/09/2021
Authors:
Lucy McKenna
belongs to
Severity (DFB) c

©2024 ARKni back to ToC or Named Individual ToC

IRI: https://openark.adaptcentre.ie/Ontologies/ARKCube#RightsStatement

belongs to
Rights Statement c

Legend back to ToC

c: Classes
op: Object Properties
dp: Data Properties
ni: Named Individuals
ep: External Properties

References back to ToC

Add your references here. It is recommended to have them as a list.

Acknowledgments back to ToC

The authors would like to thank Silvio Peroni for developing LODE, a Live OWL Documentation Environment, which is used for representing the Cross Referencing Section of this document and Daniel Garijo for developing Widoco, the program used to create the template used in this documentation.